From the evening of August 4 to the early morning of August 5, 2026, the CENTRAL’s PMB at The Legend City Da Nang successfully completed the concrete pouring for the Level 4 transfer slab and beams, featuring a structural depth of 2.7 meters and a width of 2.95 meters. The milestone is recognized as the largest transfer slab and beam system completed in Da Nang to date, marking a significant achievement in the project’s construction progress.
The large-scale concrete pour involved approximately 4,500 m³ of mass chilled concrete, 1,000 tons of reinforcement steel, and an integrated post-tensioning cable system within the transfer beam structure. The substantial material volume and stringent technical requirements demanded meticulous planning, coordination, and quality control throughout every stage of execution.
To ensure uninterrupted construction, the PMB worked closely with multiple major concrete suppliers, mobilizing dozens of concrete mixer trucks, boom pumps, and line pumps to operate continuously overnight and maintain a stable concrete supply throughout the pour.
Strategically located on a prime site with four frontages at the foot of Cau Rong Bridge, The Legend City Da Nang comprises 03 basement levels and two 29-story towers, accommodating hotel and high-end residential functions. The project is currently among the prominent developments attracting significant attention in Da Nang and the Central Vietnam’s real estate market.
As the final concrete pumping operations were completed, a strong sense of pride was evident among the engineers and workers on site. The successful pour was not only the result of many hours of continuous effort, but also a testament to the close coordination, strong sense of responsibility, and determination demonstrated by the Client, CENTRAL, and all partners.
Following this major milestone, the PMB will continue executing the structural works for the typical floors, steadily advancing the project in line with the committed schedule and quality standards.
Congratulations to the entire The Legend City Da Nang’s PMB!
Just over four months after taking possession of the construction site, the Nguyen Tat Thanh Bridge Project in Cam Lam Commune, Khanh Hoa Province has successfully launched the installation of its first Super-T girders, marking a significant milestone in the bridge’s structural construction. In parallel, pier construction and girder casting activities continue as planned to maintain the project’s overall schedule.
Spanning approximately 800 metres across the Thuy Trieu Lagoon on Nguyen Tat Thanh Boulevard, the bridge is designed with a modern steel arch structure integrated with reinforced concrete, featuring two independent spans to ensure long-term structural integrity, operational safety, and durability. As a key transportation infrastructure project, the bridge will strengthen connectivity between Nha Trang City, Cam Lam, and Cam Ranh International Airport, while contributing to the completion of the regional transport network and supporting the socio-economic development of southern Khanh Hoa Province.
Project Site Overview of the Nguyen Tat Thanh Bridge Project, Cam Lam Commune, Khanh Hoa Province
According to the construction schedule, the installation of all Super-T girders is expected to be completed by September this year. Demonstrating strong commitment and determination, CENTRAL’s PMB, together with its engineers, technical staff, and construction workforce, is accelerating site activities around the clock by mobilising maximum manpower and equipment to ensure the project is delivered on schedule, while meeting the highest standards of quality, safety, and technical excellence.
Youtube: https://youtu.be/Vt3hREz4vVk
Highlights photos of the Super-T girder installation:
On May 30th, 2026, CENTRAL Construction Joint Stock Company held the Closing Ceremony and Certificate Presentation for the Executive Training Program on Servant Leadership, recognizing managers from across the Company’s operations in Northern, Central and Southern Vietnam, as well as its international markets. The program marks a significant milestone in CENTRAL’s ongoing journey to transform its leadership mindset and enhance organizational performance.
The Servant Leadership Program, developed and delivered by Blanchard Vietnam (PACE Institute of Management) at CENTRAL’s request, was designed to redefine the role of leadership in the modern organizations. Conducted over four weeks, from April 18 to May 30, 2026, the program welcomed nearly 150 employees holding positions from Project Directors and above. Following its successful completion, CENTRAL plans to extend the program to its next generation of management talent in the future.
Throughout the program, CENTRAL reaffirmed its strategic commitment to people development, innovation, and people-centered leadership, while strengthening management capabilities across the organization. The initiative also supports the Company’s broader transformation strategy, including organizational restructuring, streamlined operations, clear delegation of authority, and empowering leaders at every project site and functional department.
Over the four-week learning journey, participants explored essential leadership principles, from active listening, empathy, and constructive feedback to the deeper meaning of serving others through leadership. These lessons introduced new perspectives on managing teams and cultivating high-performing organizations. The program reinforced the belief that a truly strong organization is defined not by hierarchy or job titles, but by the responsibility, integrity, and leadership demonstrated by every individual.
More than simply marking the completion of a training course, the certificate presentation ceremony celebrated the participants’ commitment to continuous learning and personal growth. CENTRAL expects the values and leadership principles cultivated through the program to continue spreading throughout its projects, departments, and teams, fostering a leadership culture built on trust, accountability, service, and people development.
At CENTRAL, creating a happy workplace-where people are respected, empowered, and given opportunities to grow-remains a long-term commitment and a fundamental pillar of the Company’s sustainable development strategy.
On 10 and 11 June 2026, CENTRAL Construction Joint Stock Company successfully organized its annual 2026 Internship Orientation and Training Program for outstanding students selected from the Ho Chi Minh City University of Technology (HCMUT) and the University of Architecture Ho Chi Minh City (UAH). Since the Company’s early years, the program has served as a key talent development initiative, fostering a strong pipeline of future professionals while providing students with early career opportunities in a professional working environment and a competitive compensation framework upon graduation.
The program commenced with a welcome address by Mr. Tran Quang Tuan, CEO of CENTRAL, who shared the Company’s long-term development vision and strategic direction. Through inspiring real-life stories about CENTRAL’s journey to becoming one of Vietnam’s leading General Contractors and its roadmap toward expanding into international markets, Mr. Tuan encouraged the interns to continuously develop their professional expertise, strengthen their sense of responsibility, and cultivate the ambition to conquer new industry standards. The Company’s leadership also expressed its expectation that the next generation of engineers will embrace lifelong learning, resilience, and a commitment to excellence throughout their careers.
Mr. Tran Quang Tuan, CEO of CENTRAL, welcomed the interns and shared the Company’s development vision
During the program, Ms. Cao Thi Diem Chau, Human Resources Manager of CENTRAL, provided an overview of the 2026 Internship Recruitment Program, introducing the internship roadmap, professional development opportunities, and the learning experience designed for participants throughout their journey with the Company. Through its long-term strategy of identifying and nurturing talent at an early stage, CENTRAL is committed to creating a practical learning environment where young professionals can develop their capabilities, enhance their skills, and confidently prepare for their future careers.
Ms. Cao Thi Diem Chau, Human Resources Manager of CENTRAL, presented an overview of the 2026 Internship Recruitment Program
As part of the program, the interns participated in a comprehensive onboarding and professional training series covering the Company’s history and development, corporate culture, organizational structure, and the roles and responsibilities of each department. In addition, they received fundamental knowledge of construction project management, site management organization, and the key construction processes and operational procedures implemented across CENTRAL’s projects.
Through its annual internship training program, CENTRAL continues to reaffirm its long-term commitment to partnering with leading universities in developing high-quality human resources for Vietnam’s construction industry. Beyond providing students with valuable exposure to a professional working environment, the Company aims to cultivate a new generation of engineers equipped with technical competence, innovative thinking, and global readiness-empowering them to deliver sustainable construction projects that create lasting value for communities.
On the morning of July 22nd 2026, the joint investment partnership comprising T&T Group, Cienco 4, and Quang Tri Airport Co., Ltd., in collaboration with CENTRAL Construction Joint Stock Company, held the Topping-out Ceremony for the Air Traffic Control Tower of the Quang Tri Airport Project in a formal ceremony in Gio Linh District, Quang Tri Province.
The event was attended by representatives of the Investors, the General Contractor, the Supervision Consultant, as well as the PMB teams.
Overview of the Air Traffic Control Tower Topping-out Ceremony at Quang Tri Airport Project
Representatives of all parties took a commemorative photo at the topping-out ceremony
With a total investment, worth 5,821 billion VND, the Quang Tri Airport Project is one of the key transportation infrastructure developments in the North Central region of Vietnam. The project has now entered its peak construction phase, with 260.7 hectares of cleared land out of the total 265.3 hectares, while multiple critical work packages are being executed simultaneously.
The topping-out of the Air Traffic Control Tower marks the successful completion of the project’s first major structure, representing a significant construction milestone. Often regarded as the “brain” of airport operations, the Air Traffic Control Tower is a highly specialized facility requiring exceptionally stringent standards in structural engineering, architectural design, aesthetics, and the installation of advanced air traffic management systems. It will serve as the operational hub responsible for ensuring flight safety and coordinating all airport operations once the airport becomes operational.
Recognizing its critical role, the project team prioritized this package from the earliest stages of construction. Despite challenging weather conditions, complex geological characteristics, and demanding schedule requirements, CENTRAL’s engineers and construction workforce worked tirelessly around the clock to complete the structure on schedule, laying a solid foundation for the integrated operation of the airport’s entire aviation system.
Quang Tri Airport is being developed under the public–private partnership (PPP) model. Groundbreaking took place in July 2024, with total investment exceeding VND 5.8 trillion. The project is under the public-private partnership (PPP) model. The project meets the standards of a level 4C airport, capable of handling code E aircraft and irregular international flights; and is also a level II military airport, with a designed capacity of 5 million passengers/year.
Construction progress update of Quang Tri Airport on the day of the Air Traffic Control Tower topping-out ceremony
According to the latest progress update from the PMB, construction of the airport’s other major components-including the runway, taxiways, passenger terminal, and technical infrastructure-is progressing concurrently with the completion of the control tower. For the passenger terminal, the primary structural works have been substantially completed. Internal and external masonry and plastering are underway, while installation of the terminal’s roof steel structure, auxiliary facilities, and supporting infrastructure continues as planned. Meanwhile, the runway has been completed. For the taxiway and airfield drainage system, organic soil stripping, mud excavation, subgrade excavation, and compaction have all been completed, achieving the required K98 compaction standard.
As the General Contractor for the Quang Tri Airport Project-one of Vietnam’s national key infrastructure developments, CENTRAL is proud to contribute to the expansion of the Central Region’s aviation network, creating a vital foundation for regional socio-economic development. Upon completion, the airport is expected to become a new catalyst for tourism, logistics, and investment attraction across Quang Tri Province and its economic zones.
With the highest level of commitment, the project team continues to mobilize all available resources while maintaining rigorous control over construction progress, quality, and safety. CENTRAL remains fully committed to delivering the project on schedule and contributing to the development of a modern aviation infrastructure that supports Vietnam’s sustainable growth.
On June 5, 2026, the Hubexo Asia Awards 2026, one of the construction industry’s most anticipated annual events, was held at the Sheraton Saigon Grand Opera Hotel in Ho Chi Minh City, marking the 21st anniversary of recognizing outstanding achievements in architecture and construction across Asia. At the ceremony, CENTRAL Construction Joint Stock Company was honoured among the Top 10 Contractors in Vietnam for the third consecutive year, an accolade presented by the international organization Hubexo, formerly known as BCI Asia.
CENTRAL representative receives the Top 10 Contractors in Vietnam award at the Hubexo Asia Awards 2026
The prestigious atmosphere at the Hubexo Asia Awards 2026 Ceremony
Celebrating its 21st year, the Hubexo Asia Awards remains one of the region’s most respected recognitions in architecture and construction, continuing its mission of promoting innovation, excellence, and sustainable development across Asia. Beyond recognising achievements, the Hubexo Asia Awards continues to serve as a platform for collaboration and industry engagement, fostering meaningful connections among professionals and organisations helping shape the future of Asia’s built environment.
Being recognised among the Top 10 Contractors in Vietnam for three consecutive years represents far more than recognition of CENTRAL‘s outstanding contributions to Vietnam’s construction industry. It also reaffirms the Company’s scale, technical expertise, and internationally benchmarked construction capabilities as it continues its journey toward global expansion. Through this prestigious recognition, CENTRAL remains committed to working alongside industry-leading firms whose work continues to shape Vietnam’s urban and architectural landscape while setting new benchmarks for innovation, sustainability, project excellence, and create lasting value for the architecture and construction community throughout Asia.
Trophy and Certificate for the Top 10 Contractors 2026
Ms. Sally Kheng, Head of Strategic Partnership & Events – Asia, Hubexo, delivers her congratulatory remarks
Speaking at the Hubexo Asia Awards 2026, Ms. Sally Kheng, Head of Strategic Partnership & Events – Asia at Hubexo, congratulated this year’s award recipients: “What makes Vietnam particularly inspiring is not only the pace of development, but the people behind it. Architects, developers, consultants, contractors, and suppliers have continued to innovate, adapt, and collaborate to deliver projects that support economic growth and improve the quality of life for communities. Even amidst global challenges, Vietnam’s built environment sector continues to demonstrate optimism, resilience, and a clear vision for the future,”
Representatives of the Top 10 Contractors in Vietnam took a commemorative photograph
Despite continuing market fluctuations and increasing challenges across the construction industry, CENTRAL has reaffirmed its position as one of Vietnam’s leading contractors through resilience, adaptability, innovation, and an unwavering commitment to excellence. Receivingthe Top 10 Contractors in Vietnam title from Hubexo for the third consecutive year is not only a recognition of the Company’s achievements to date but also a powerful motivation to continue setting new benchmarks for the construction industry.
Driven by its aspiration to contribute to Vietnam’s sustainable development, CENTRAL remains committed to advancing the principles of Green, Smart, and Human-Centric Development, delivering landmark projects that create enduring value for communities, society, and future generations.