The CENTRAL packages in this project include structural, finishing, and MEP. The project is built on a land area of 9,800 m2, total floor area of 20,000 m2. Emasi Nam Long is designed in a modern architecture suitable for high-class…
At Edison International School, CENTRAL is the Main Contractor for the construction of the structure and the completion of the Project. The school campus has an area of 21,500m2 with a construction scale of 5 blocks, main classroom system, function…
Chadwick International School Hanoi is a prestigious educational foundation from the US. Chadwick currently operates three campuses, in which, Vietnam is the third one in the two others are in the US and Korea. The project is constructed on 4.7…
Phenikaa University is a private university in Hanoi offering multi-disciplinary training, especially in science, engineering, and technology, with the aim of training the Vietnamese young generation who have the ability to confidently global integration, potential realization, and meaningful life.
With Blue Sky Mega Residence, CENTRAL was the General Contractor for structure, finishing, electromechanics, and infrastructure. Blue Sky was built on a beautiful campus with a playground arranged landscape, trees, vegetable garden based on the view of children with attractive…
In this project, CENTRAL acts as General Contractor for construction of basement, body, and finishing structures and MEP with a total floor area of over 29,000 m2 topping-out ceremony topping-out ceremony topping-out ceremony, including a basement of 4,100 m2 and 07 floors…