CENTRAL CO-ORGANIZES WORKSHOP ON SUSTAINABLE SOLUTIONS FOR GREEN FAÇADE

On the morning of 27/04/2023, CENTRAL cooperates with GreenViet Company and AGC Asia Pacific to organize a seminar with the topic “Sustainable Solutions for Green Façade” at CENTRAL Office headquarters. The event attracted speakers and guests from companies.

  • Mr. Do Huu Nhat Quang – Co-Founder & Business Development Director, Greenviet Green Building Consultancy;
  • Mr. Lim Yew Meng – Executive Director, AGC Asia Pacific;

 And guests from Companies:

  • Mr. Vuong Thanh Lam – Managing Director at Vertical Studio;
  • Mr. Ho Trong Hien – Chief Executive Officer, RFR FV – France Viet Nam Engineering;
  • Mr. Dang Viet Khoa – Managing Director, KAZE Interior Design Studio;

Together with a large number of managers and technical experts of CENTRAL.

The workshop is an opportunity to meet and exchange sustainable solutions in the field of construction. Currently, green buildings have been interested by many investors. At the workshop, speakers presented the process to obtain Green Building certification from design, bidding, construction to operation. By simulating the design of energy and natural light for the façade at an early stage of the building design process, the idea will help optimize the cost, optimize energy for the façade system and air conditioning system for the building.

At the same time, the speakers introduced the features and properties of new materials through 3 topics:

  • Energy-Efficient Glass/Energy-Generating Glass
  • ETFE Lightweight Materials
  • FEVE-based coatings

Using new materials with sustainability and efficiency helps the construction work and the cost of each project to be more economical and optimized.

Currently, green building technology and materials play an important role in evaluating green buildings for sustainable development. The application of green technology in the building is considered the optimal solution that makes an important contribution to creating a green building from design, structure, materials, and colors. Not only related to the quality of architectural aesthetics but also promoting efficiency in energy saving.

At CENTRAL, we have been constructing many projects according to “Green Façade” standards such as:

  • Emasi Plus International School – Water Point Campus – Leed Gold Standard
  • UOA Tower, The Metropole, Chadwick International School – BCA Green Mark Standard

Most especially, C.P. Office Building and Etown 6 projects received the LEED Platinum Ver.04 standard, the highest level of LEED standards of the US Green Building Council today. These projects will be the first ones to meet the highest level of green standards in Vietnam.

Some pictures of the seminar:

Mr. Do Huu Nhat Quang – Co-Founder & Business Development Director, Greenviet Green Building Consultancy discussed with the guests
Mr. Lim Yew Meng – Executive Director, AGC Asia Pacific presented at the seminar
Mr. Tran Minh Thi – Design & Build Director gave a speech
Guests joined the discussion with the speakers
Guests and speakers took photos to congratulate the successful workshop

CENTRAL RECEIVED 3 CATEGORIES AT THE VIETNAM BEST PLACES TO WORK 2022 AWARD CEREMONY​

On the evening of November 9, 2022, at White Palace Hoang Van Thu Convention Center, The Vietnam Best Places To Work 2022 Award Ceremony held by ANPHABE professional community network and INTAGE Vietnam market research company took place in a solemn and majestic atmosphere. This is also the 9th year that the unit has announced this list.

Mr. Mai Chanh Thanh – Executive Director received the Top #4 – Vietnam Best Places To Work 2022 in Construction/ Architecture
Mrs. Mai Thi Kim Dung – Head of Human Resources Department received the Top #50 – Vietnamese Attractive Employers 2022
CENTRAL’s BOD received the awards

The above results are concluded from the Vietnam Best Workplaces 2022 survey conducted by Anphabe from April to September this year, with the participation of 57,939 employees, in 515 companies. In addition, this unit also conducts in-depth surveys and interviews with about 150 leaders and human resource managers in 20 main industries.

2022 is the first year that CENTRAL was named in the Top #100 – Vietnam Best Places To Work with total 3 categories:

1. Top #4 – Vietnam Best Places To Work 2022 in Construction/ Architecture

2. Top #50 – Vietnamese Attractive Employers 2022

3. Top #100 – Vietnam Best Places To Work 2022

Top #100 – Vietnam Best Places To Work 2022 & Top #50 – Vietnamese Attractive Employers 2022

Receiving 3 award categories simultaneously is the most visual and complete demonstration of the perseverance and relentless efforts that CENTRAL people have been aiming for during the past. CENTRAL is not only the leading general contractor in Vietnam but also a professional & different workplace. Human resources are the most valuable asset. CENTRAL requires each of our members to innovate and enhance their capacity by facilitating their empowerment and self-development.

CONGRATULATIONS TO OUR CENTRAL TEAM!

MARRIOTT HOTEL COMMENCEMENT CEREMONY

On the morning of October 07th, 2022, CENTRAL in collaboration with Phenikaa Group holds the Marriott Commencement Ceremony in Tay Ho District, Hanoi with the presence of two parties’ leaders.

The PMB performed the incense offering ceremony

PROJECT INFORMATION

Project name:Marriott Hotel
Scale:04 basements and 27 floors
Investor:Phenikaa Group
Operations Manager:Marriott International
Address:Phu Thuong and Xuan La Ward, Tay Ho District, Hanoi
Land area:3626,8 m2

Marriott Hotel is a complex including offices, hotels, and luxury apartments, located in the center of Hanoi, managed and operated according to international quality standards by Marriott International.

The project perspective of Marriott Hotel in Hanoi

Phenikaa Group was built and grown to be a pioneering and prestigious brand in Vietnam and internationally for advanced materials, high-grade ecological materials, smart products, smart solutions, and smart manufacturing. Over 10 years of establishment and development, Phenikaa Group has nearly 20 subsidiaries that operate both locally and globally and focus on the core sectors: Technology; Industrial Manufacturing; Scientific Research; and Education and Training.

Phenikaa Group is the traditional customer that CENTRAL has cooperated with and is trusted as the General Contractor for Structuring, Finishing works, and MEP at the two projects: Phenikaa University 12 block 8 floors and Phenikaa Central Library 2 towers, 1 basement, and 30 floors. CENTRAL team’s performance and wholehearted enthusiasm are highly appreciated along with quality, and considerable progress; which strengthens the investor’s conviction to appoint the Marriott Hotel project to CENTRAL.

With the reputation as a leading General Contractor in Vietnam, along with experiences through large-scale projects (4-5 basements) such as Etown 6, UOA Tower, Syrena Ho Tay Hotel… CENTRAL believes that this next cooperation will continue to bring a high-quality, high-class project, add value to investors, and at the same time meet the expectations of the Investor.

The joy of PMB on the Commencement Ceremony

CENTRAL WINS CORPORATE EXCELLENCE AWARD AT APEA 2022

CENTRAL was continually honored in the category of Corporate Excellence Award at the Asia Pacific Enterprise Awards 2022 (APEA) on October 07th, 2022 at Gem Center.

This prestigious prize demonstrated the Company’s tireless efforts in sustainable development and meaningful community activities.

Mr. Mai Chanh Thanh – Executive Director received the Corporate Excellence Award APEA 2022

“Our mission in every project is not only to build but also to shape a better living foundation. We are proud to have our hands in the urban development towards the economic and social growth targets. CENTRAL gradually improves the life quality and builds a long-lasting solid presence in Vietnam and ASEAN.” – Mr. Mai Chanh Thanh shared.

CENTRAL’s Board of Directors at APEA 2022

Taking place annually since 2007, APEA is held by Enterprise Asia – a non-governmental organization in pursuit of creating an Asia that is rich in entrepreneurship, aiming to honor organizations who have shown outstanding performance and tenacity in developing successful businesses, whilst not neglecting the social responsibilities that come with leadership based on the following criteria such as financial audit, business data assessment, and leadership capacity continuously for many years, independent assessment of corporate brand through various reliable sources.

At the ceremony, Dr. Fong Chan Onn – Chairman of Enterprise Asia emphasized: “Enterprise Asia believes in providing a platform, due recognition and publicity to Asia’s leading entrepreneurs and organizations to promote sustainable leadership, innovation, and responsible entrepreneurship.”

Dr. Fong Chan Onn gave a speech at the ceremony

This year, APEA 2022 announced various nominees through a rigorous evaluation process by a jury of prominent judges across four categories: Master Entrepreneur, Inspirational Brand, Fast Enterprise, and Corporate Excellence. The program was held solemnly and professionally. This is also an opportunity for businesses to meet and connect with each other.

HORENSO TRAINING PROGRAM

Aiming to enhance effective communication and form the company’s culture, on August 24th, 2022, CENTRAL cooperated with PACE to hold the HORENSO Training Course.

Attending the class, there are senior managers from Departments/Projects.

HORENSO stands for:

  • “Hokoku” is to report;
  • “Renraku” is to inform and notify of facts;
  • “Sodan” is to consult or discuss..

There is not only an internal communication method for teamwork but also an imprint of Japanese culture. Now, it has been used in many businesses all over the world.

The training course focuses on 2 main parts: the value and the role of Horenso; the application of Horenso in work relations and practices.

In addition to the basic knowledge, throughout the training program, exercises in group activities help students gain the necessary thinking and awareness to be able to understand the principles, processes, tools, and methods to do well in the actual work that the trainees are in charge of.

THAO DIEN GREEN TOPPING-OUT CEREMONY

On the morning of August 22nd, 2022, CENTRAL cooperated with SIC Investor to organize the Thao Dien Green Topping-out Ceremony at 192 Nguyen Van Huong, Thao Dien Ward, Thu Duc City, HCMC.

The ceremony is an important milestone proving that the construction progress of the project is taking place in accordance with the requirements of the investor.

Leaders of the parties at the Thao Dien Green Topping-out Ceremony
The atmosphere of the Topping-out Ceremony

Attending the ceremony, there was the presence:

On the side of Investor SIC:

  • Mr. Ta Huu Long – Vice Chairman of the Board of Directors
  • Mr. Le Dang Minh – Member of the Board of Directors, General Director
  • Mr. Nguyen The Vinh – Member of the Board of Directors, Deputy General Director

On the side of the Supervision Consultant – FQM:

  • Mr. Nguyen Thanh Phuong – Deputy General Director
  • Mr. Nguyen Le Thuan – Project Division Director

On the side of General Contractor – CENTRAL:

  • Mr. Tran Quang Tuan – Chairman & CEO
  • Mr. Mai Chanh Thanh – Executive Director
  • Mr. Vu Duc Tai – Executive Director
  • Mr. Nguyen Duc Hien – MEP Project Director
  • Mr. Huynh Minh Trong – Site Manager
  • Mr. Nguyen Huu Dinh –  MEP Site Manager

With the participation of partners, agents, suppliers, subcontractors and employees of the parties.

Leaders of the parties performed the incense offering ceremony

Thao Dien Green Project The project has a golden & unique location with a panoramic view of the city and the Saigon River, creating a landscape of harmony between nature and modern life. In addition, the ability to connect to administrative centers as well as convenient to move to neighboring districts, creating convenient commerce. At the same time, the project is also the best investment opportunity for real estate investors in the context of the shortage of downtown real estate.

Thao Dien Green topping-out ceremony

PROJECT INFORMATION:

Land area:5.000 m2
Scale:2 basements and 25 floors
CFA:40.000 m2
Form:General contractor for the basement, body structure, and MEPF
Time:26 months

The project has a unique architectural design, requiring accurate construction methods. During the implementation process, CENTRAL’s PMB always received high appreciation from investors.

Congratulations to the PMB for successfully topping out the project on schedule.

Congratulations to SIC Investor for bringing customers a segment of high-class real estate products in the southern region.

Leaders of the parties performed the lifting golden steel ceremony.
Thao Dien Green’s PMB at the topping-out ceremony