CENTRAL & 620 INFRASTRUCTURE CONTRACTOR JOINT VENTURE LAUNCHES CONSTRUCTION OF THREE MAJOR BRIDGE PROJECTS AT THE START OF LUNAR NEW YEAR 2026

On the first working days of Lunar New Year Binh Ngo 2026, with strong determination and accelerated momentum, the contractor joint venture of Central Construction JSC (CENTRAL) and 620 Infrastructure Development And Investment Corporation officially commenced simultaneous construction of three key infrastructure bridge projects in Ho Chi Minh City and Khanh Hoa Province.

1. Bridge No.1 & Bridge No.2 – Can Gio Sea Reclamation Tourism Urban Area

Project:Bridge No.1 & Bridge No.2 – Can Gio Sea Reclamation Tourism Urban Area
Place:Can Gio Commune, HCMC
Investor:Vinhomes JSC
Scale:Bridge No.1: 680 meters (from Km0+040 to Km0+720)
Bridge No.2: 1,120 meters (from Km0+240 to Km1+360)
Total length:1,800m
Perspective of Bridge No.1 – Can Gio Sea Reclamation Tourism Urban Area
Perspective of Bridge No.2 – Can Gio Sea Reclamation Tourism Urban Area

The Bridge No.1 & Bridge No.2 – Can Gio Sea Reclamation Tourism Urban Area are located along the main axis connecting to the northern T6 route in the Can Thanh area of Can Gio Commune. The main roadway is designed to meet urban arterial street standards, with a design speed of 60 km/h, in compliance with TCVN 13592:2022 and QCVN 07-4:2023/BXD. The primary bridge span measures 390 meters and features a steel arch structure with composite steel deck girders. The bridge is 29 meters wide, comprising four motor vehicle lanes, two mixed-traffic lanes, and two pedestrian sidewalks. Approach bridges utilize precast Super-T prestressed reinforced concrete girders—an optimal technical solution ensuring both construction efficiency and long-term durability.

2. Nguyen Tat Thanh Bridge – Khanh Hoa Province

Project:Nguyen Tat Thanh Bridge
Place:Cam Lam Commune, Khanh Hoa Province
Investor:Vinhomes JSC
Scale:Approximately 400 meters crossing Thuy Trieu Canal along Nguyen Tat Thanh arterial route
Perspective of Nguyen Tat Thanh Bridge

Designed as a modern arch bridge using a combination of steel and reinforced concrete structures, the project includes two independent spans to ensure safe, flexible, and sustainable long-term operation. Nguyen Tat Thanh Bridge is a strategic transportation infrastructure project situated along the key corridor connecting Nha Trang City, Cam Lam District, and Cam Ranh International Airport. The bridge will facilitate mobility, urban expansion, and socio-economic connectivity in southern Khanh Hoa Province.

It is also positioned as a “strategic infrastructure artery,” symbolizing synchronized development between transportation infrastructure and modern urban planning in the Cam Lam – South Khanh Hoa area.

Within its long-term development strategy, CENTRAL has defined four strategic pillars. General Construction remains the core foundation, complemented by three expansion pillars: Infrastructure, International Markets, and Investment.

The infrastructure sector has been prepared well in advance. In 2023, CENTRAL participated in the construction of three bridges along the Can Tho – Hau Giang Expressway. In 2025, CENTRAL acquired a 51% stake in 620 Infrastructure Development And Investment Corporation, marking a pivotal milestone in its strategic expansion into transportation infrastructure development.

The CENTRAL – 620 Infrastructure contractor joint venture forms a strong integrated system combining:

  • CENTRAL’s governance capability, financial strength, and General Contractor expertise
  • 620 Infrastructure’s specialized experience in transportation infrastructure construction

This synergy enables the consortium to proactively manage construction organization, technical control, schedule management, and occupational safety—meeting the stringent requirements of large-scale, high-standard bridge projects.

With a solid operational foundation, a highly qualified engineering team, and a disciplined management system, the CENTRAL – 620 Infrastructure contractor joint venture is committed to delivering projects on schedule, ensuring quality and safety, and contributing to the development of sustainable infrastructure for communities and society at large.

AMBASSADOR OF ISRAEL VISITS AND EXTENDS GREETINGS TO CENTRAL

On February 10th, 2026, H.E. Mr. Yaron Mayer, Ambassador of Israel traveled from Ha Noi to Ho Chi Minh City to visit and meet with the CENTRAL’s BOD and extended New Year greetings and gifts to CENTRAL’s engineers and workers at CENTRAL’s head office. Mr. Tran Quang Tuan, Chairman & CEO of CENTRAL, together with the Company’s BOD, warmly welcomed the Ambassador in a formal, open and cordial atmosphere.

CENTRAL’s BOD welcomed the Ambassador at the head office
H.E. Mr. Yaron Mayer, Ambassador of Israel engaged in friendly discussions and shared valuable insights with CENTRAL’s BOD

On behalf of CENTRAL, the Company’s BOD sincerely thanked the Ambassador for his continued interest, support and companionship. Speaking at the meeting, Chairman & CEO Tran Quang Tuan affirmed: “With a strong sense of responsibility, CENTRAL places great emphasis on carefully evaluating the quality of recruitment and training for Vietnamese engineers, specialists and workers assigned to projects in Israel. We are committed to ensuring proper living conditions, accommodation and a safe, professional working environment for our workforce. At the same time, we look forward to continued support and connection from the Ambassador in promoting cooperation opportunities and project implementation between our two countries.”

Currently, CENTRAL has signed contracts and is directly implementing 8 large-scale projects across several major cities in Israel. The Company has recruited and trained 600 workers, who are ready to be deployed to Israel immediately after the Lunar New Year of the Year of the Horse 2026, enabling the simultaneous execution of multiple projects with a strong spirit of determination.

Greeting Card from H.E. Mr. Yaron Mayer, Ambassador of Israel

At the conclusion of the visit, Chairman & CEO Tran Quang Tuan presented H.E. Mr. Yaron Mayer, Ambassador of Israel with a commemorative gift symbolizing friendship and cooperation. The two sides took souvenir photos, marking a meaningful meeting that opens up promising prospects for practical and sustainable cooperation in the future.

H.E. Mr. Yaron Mayer, Ambassador of Israel and Chairman & CEO Tran Quang Tuan exchange commemorative gifts
H.E. Mr. Yaron Mayer, Ambassador of Israel Mayer takes a commemorative photo with CENTRAL’s BOD

Previously, in May 2025, during an official visit to Viet Nam, Mr. Yoav Ben Tzur, Minister of Labor of the State of Israel, together with Ambassador Yaron Mayer, met with Prime Minister Pham Minh Chinh, leaders of the Ministry of Home Affairs, and representatives of CENTRAL.

The meeting took place in a special context, as no bilateral labor cooperation agreement had yet been signed between the two governments. With the aim of strengthening bilateral relations, H.E. Mr. Yaron Mayer, Ambassador of Israel actively facilitated exchanges between relevant authorities of both countries and advocated for the Vietnamese Government to consider granting a special and unprecedented mechanism allowing CENTRAL to deploy engineers and workers to Israel. 

After nearly 3 years of persistent negotiations and coordination, with close support from the competent authorities of both countries, CENTRAL became the first and only enterprise to be granted a license by the Government of Viet Nam to send workers to Israel (License No. 3191/SNV-VLATLĐ, dated September 11th, 2025). This historic decision not only marks a significant milestone for CENTRAL, but also lays an important foundation for both governments to further evaluate and the labor cooperation framework, opening new opportunities for trade and workforce collaboration between Viet Nam and Israel.

This pioneering milestone provides inspiration and a solid premise for Vietnamese enterprises and workers to confidently participate and operate in the Israeli market in the coming years, while affirming CENTRAL’s credibility, capability and proactive role in international integration.

On the morning of May 21st, 2025, at the Government Office, Israeli Minister of Labor Yoav Ben Tzur met with Prime Minister Pham Minh Chinh

Selected projects currently implemented by CENTRAL in Israel include:

Aura Pivko Project
GS City Project
BS Towers Project

2025 YEAR-END CONFERENCE IN NORTHERN & CENTRAL REGIONS

Following the strong success of the 2025 Year-End Conference in the Southern region, on January 24, 2026, CENTRAL Construction Joint Stock Company continued to organize the 2025 Year-End Conference for the Northern and Central regions, held simultaneously at Vinpalace Co Loa (Hanoi) and Novotel Da Nang. The event was attended by the Company’s BOD and brought together more than 500 employees and invited guests, creating a solemn, cohesive, and inspiring atmosphere that connected all three regions of the country.

CENTRAL’s leadership raising a toast to celebrate the Year-End Conference in Northern & Central Regions

During the program, a highlight video reviewing CENTRAL’s 2025 journey was presented, vividly portraying a year marked by relentless effort and perseverance. Through these moments, employees had the opportunity to reflect on a year filled with challenges and pressure, yet also overflowing with pride in the achievements collectively created by the CENTRAL team.

Mr. Tran Quang Tuan – Chairman of CENTRAL, delivering remarks at the Northern Region Conference

Speaking at the Northern Region Conference, Mr. Tran Quang Tuan – Chairman of CENTRAL, expressed his sincere appreciation for the unwavering dedication and contributions of the entire CENTRAL team, which led to significant accomplishments in 2025, including: A flexible management model; A resilient and disciplined workforce and most notably, the steadfast commitment to CENTRAL’s core professional philosophy: “Every project is the Investor’s honor and our own professional commitment.”

Mr. Chau Anh Tuan – Executive Director of CENTRAL, shared at the Central Region Conference

Encouraging and expressing gratitude to the Central region workforce, Mr. Chau Anh Tuan emphasized: “The Central region is a strategic area for CENTRAL. We pursue selective growth-building each project, each team, and each partnership with solid foundations. As we enter 2026, CENTRAL has clearly defined its spirit of action: ‘STAY FOCUSED, MOVE FASTER.’ I firmly believe that with a foundation built on discipline, capability, and trust, CENTRAL Central Region is fully prepared to step into 2026 with greater stability, proactiveness, and strength.”

At the Northern & Central Regions Year-End Conference, CENTRAL also honored and expressed appreciation to hundreds of subcontractors and labor partners currently working across projects in the region, acknowledging their essential role in the Company’s overall success.

CENTRAL leadership honoring outstanding partners in the Northern & Central regions

To recognize and celebrate the persistent dedication and contributions of employees throughout 2025, the BOD held a commendation ceremony, presenting awards to outstanding teams and individuals as a meaningful gesture of gratitude and timely encouragement for exceptional performance.

CENTRAL leadership honoring exemplary projects in the Northern & Central regions

The program concluded with a warm and intimate celebration banquet, where colleagues shared joy over the achievements of the past year, participated in a lucky draw featuring valuable prizes, and reaffirmed their determination to stay united and committed as they move forward into a new journey filled with inner strength and breakthrough ambitions.

Highlights from the Northern & Central Regions 2025 Year-End Conference: