CENTRAL WINS THE FULL PACKAGE OF HAPPY ONE CENTRAL PROJECT

CENTRAL officially received a letter of acceptance to be the General Contractor for FULL PACKAGE contractor of the Happy One Central Project from Van Xuan Group Investor on 29 April 2021.

Located in Thu Dau Mot City, Binh Duong Province, Happy One Central is the project that CENTRAL had constructed the bored pile and diaphragm wall from November 2020 and finished on May 2021. During the progress, because of CENTRAL’s professionalism, drastic and high commitment, the Investor totally trusted and decided to give all the remaining items of the Project to CENTRAL as the General Contractor from the basement, structures, finishing, and MEP including Landscape, Facade, FULL interior, elevator system, Smart home, etc.

CENTRAL has given an optimal construction solution, along with the detailed consultation for the Investor so that the Project can be accurately calculated, as well as the optimized solution for bearing structure, saving time and cost.

Perspective HAPPY ONE CENTRAL Project

Project Information:

– Land area : 10.162m2
– CFA: 159.892m2
– Scale: 3 basements, 2 towes Hetia and Lovia with 40 floors.
– Consulting supervisor : Artelia
– Architectural design: Ong & Ong – Singapore
– Landscape design: LJ ASIA Landscape Jardins – Brazil
– Construction time: 25 months

Van Xuan Group is a famous and reputable brand in Binh Duong, it also has a strong and potential finance, mainly operates in investment and real estate. Happy One Central is the milestone Project that remarks the 15th establishment anniversary of Van Xuan Group, as well as the continuation for the Project chain success which constructed such as Happy One Phu Hoa – Binh Duong, Happy One Thanh Loc – District 12, HCMC.

Van Xuan Group always emphasizes humanity and brings satisfaction to customers with the corridor design up to 1.8m wide, which is a prominent difference compared to most high-end projects in Vietnam, whose corridor is only designed with 1.6m.

With the prime location in Binh Duong, together with integrated utilities, sophisticated design, Happy One Central promises to be an ideal residence, contributes to the city’s innovation, and builds a civilized community.

CENTRAL always strives to accompany and commit to completing the project on schedule, with safety and quality.

The real image at the gate of Project
The real construction image of the Project

CENTRAL WINS THE CHARM RESORT LONG HAI PROJECT

Charm Resort Long Hai is the unique 5-star resort and the highest storey in Long Hai until now.

It is pleasure for CENTRAL to receive a letter of acceptance of Charm Resort Long Hai Project from Charm Group in April 2021.

Perspective Charm Resort Long Hai Project
Project Information:
– Land area: 4,5 ha
– Scale: 972 sea view resort apartments, 24 sea view villas, and 17 shophouses
– Location: Long Hai Town, Long Dien, Ba Ria – Vung Tau
– Architectural design: Sicart & Smith Architects
– Operator: Vienna House – AHS Asia group

Charm Resort Long Hai is one of the outstanding projects of Charm Group with the distinctive terrain and unique design in Long Hai, Ba Ria – Vung Tau. The project is managed and operated by Vienna House – a reputed international brand leader in 5-star international hotel management and real estate, including U Hotels & Resorts, Grand Eastin Hotel, Eastin Hotel & Residences, and Eastin Easy, etc.

Master layout plan of the project Charm Resort Long Hai

Charm Group has strong financial potential, owns a clean land fund of up to several hundred hectares from Binh Duong, Long Hai, Ho Tram, Da Lat, etc. Charm Group’s projects are always filled with enthusiasm and a desire to provide customers with high-end products that are high in quality, have rich aesthetics and have professional management.

Perspective the sea villas

CENTRAL committed to implementing the project on schedule to ensure construction quality, aesthetics, as well as a superior class for the project.

Image in reality at the gate of the project

The Charm Group Management Board urgently embarked on the construction of the project.

TOPPING-OUT THE FIRST 26-FLOORS TOWER IN THE ORIGAMI AREA – VINHOMES GRAND PARK PROJECT

On the morning of March 29, 2021, CENTRAL together with Vingroup Investor and MV Vietnam Real Estate Joint Stock Company held the topping-out ceremony of two towers S7.01 and S7.05, Vinhomes Grand Park project – The Origami subdivision in Long Thanh My Ward, District 9, HCMC.

The ceremony is honored to have the presence:

  • From Investor – Vinhomes Construction Joint Stock Company:
    • Le Van Viet – Site Director
    • Nguyen Van Thuc; Mr. Hua Hong Phu – Chief Supervision Consultant
  • From Central:
    • Nguyen Thien Thuat – Project Director
    • Chau Van Bang – Project Director of MEP
    • Thap Ba Thanh Nhan; Mr. Duong Hong Cong – Chief Commander
    • Truong Minh Toan – Chief Commander of MEP
Project Management Board of Investor and Contractor doing the ritual of the topping-out ceremony

CENTRAL assumed the role of General Contractor of 4 towers S7.01; S7.02; S7.03; S7.05. Up to the present time, the construction progress has exceeded the schedule by 1.5 months. Specifically:

  • Building S7.01 and S7.05: Topping-out
  • 02 and S7.03: Expected to top-out in early May 2021
4 Towers S7.01; S7.02; S7.03; S7.05 on the topping-out day

Giving priority to ensure quality and safety while speeding up the construction, CENTRAL Executive Committee confidently handed over 4 towers ahead of time, meeting the expectations for investors.

 The Management Board was joyful on the day of topping out

PROCESS 3 PROJECTS IN THE CENTRAL

Project No.1: LOI HAI 2 WIND FARM 

Investor:REE CORP/ Thuan Binh Wind Power JSC.
Location:Loi Hai, Thuan Bac, Ninh Thuan Province
Capacity:28.9 MW/ Total Cable length 4.3 Km
BOP General Contractor:CENTRAL D&B
Supervision Consultant:Fichtner (Germany)
Turbine Supplier:Vestas Contractor (Denmark)
Total construction time:216 days
The actual picture of Loi Hai 2 Wind Farm and Phu Lac 2 Wind Farm
Total Layout Loi Hai 2 Wind Farm

Project No.2: PHU LAC 2 WIND FARM – PHASE 2

Investor:REE CORP/ Thuan Binh Wind Power JSC.
Location:Phu Lac, Tuy Phong, Binh Thuan Province
Capacity:26MW/ Total cable length 2.8 km
BOP General Contractor:CENTRAL D&B
Supervision Consultant:Fichtner (Germany)
Turbine Supplier:Vestas Contractor (Denmark)
Total construction time:228 days
Total Layout Phú Lạc 2 Wind Farm
Reference picture of wind turbine footing

Project No.3: VEGA CITY NHA TRANG

Investor:KDI Holdings
Location:Bai Tien, Duong De, Ward Vinh Hoa, Nha Trang City 
Scale:44 hectares
CFA:110.000 m2
Contract package:Main Contractor of Structure Package for Melia Hotel & New World Hotel
Including 1 basement + 8 Podium floors + 2 Tower 30 Floors
Supervision Consultant:Huyndai E&C
Total Construction time:393 days
Rerspective Vega City 44 hecta & Melia Hotel & New World Hotel

Link the article related to the project:

https://kdiholdings.com.vn/en/news/none-4/

COMMENCEMENT CEREMONY OF MASTERI CENTRE POINT PROJECT

On the morning of October 14, 2020, Masterise Homes investor and CENTRAL contractor held the commencement ceremony of Masteri Center Point project in Vinhomes Grand Park urban area, District 9, Ho Chi Minh City.

Perspective of Masteri Center Point project
Masteri Center Point construction site with the scale of 6 hectares

Attending the ceremony:

  • As Investor MASTERISE HOMES:
    • Jason Turnbull – Deputy General Director
    • Vo Tri Anh – Deputy General Director
    • Anthony Lam – Project Director
    • Le Phuoc Thanh – Project Management
  • Về phía CENTRAL:
    • Tran Quang Tuan – General Director
    • Mai Chanh Thanh – Executive Director
    • Vu Duc Tai – Executive Director
    • Watanabe Yamato – Senior Construction Manager
    • Ho Dinh Long – Project Director

With the participation of senior customer partners, strategic dealers of Masterise Homes, its suppliers, subcontractors, and employees.

Leaders of the Investor, Consultant, and Contractor parties participate in the commencement ceremony

Masteri Center Point is the most luxurious compound apartment complex located in the heart of the great urban Vinhomes Grand Park. Accompanying Masterise Homes are the world’s leading partners: Tange Associates (Japan) and NQH – Architectural Design; Landsculptor (Thailand) – Landscape design; studio HBA (USA) – Interior design and Mace (UK) – Consulting, management & construction supervision.

CENTRAL is honored to be trusted and selected by the Investor as the General Contractor of 5 Tower B6 of Masteri Center Point Project with more than 3,000 apartments. This is a worthy reward for CENTRAL’s team with great efforts, perseverance, and steadfastness with the desire to conquer world-class works.

Commencement ceremony of Masteri Center Point project

Along with the advantage of available human resources, CENTRAL has implemented work to meet committed progress and ensure the project is safe, quality, unique and differentiated as the investor’s expectation

Previously, CENTRAL handed over to the investor of the Sale Gallery model house in District 2. In particular, the investor cared and elaborated on every interior detail including choosing Hafele kitchen equipment, Kohler sanitary equipment.

Masteri Center Point model house in District 2
Leaders of all parties take souvenir photos

Masterise Homes investor, is one of the most famous ones in the Vietnamese real estate market, has created a great reputation in the industry with cult products such as Masteri Thao Dien, Masteri An Phu, Millennium, … Currently, Masterise Homes owns a series of projects in Vietnam with capital up to billions of US dollars.

https://masterisehomes.com/#ve-chung-toi

https://thanhnien.vn/tai-chinh-kinh-doanh/masteri-centre-point-ghi-dau-thang-loi-tai-le-trao-giai-propertyguru-vietnam-property-awards-2020-1291850.html

Some other photos of the ceremony:

The scene of the groundbreaking ceremony
CEO Tran Quang Tuan took a commemorative photo with the Executive Board of the Masteri Center Point project

THE COMMENCEMENT CEREMONY OF THAO DIEN GREEN TOWERS PROJECT

On the morning of August 11, 2020, CENTRAL together with the Investor – SIC Real Estate Investment Joint Stock Company held the Commencement Ceremony of Thao Dien Green Towers project, at 192 Nguyen Van Huong, Thao Dien Ward, District 2, City. Ho Chi Minh City.

Perspective of Thao Dien Green Towers project

The ceremony is honored to have the attendance of:

  • As Investor – SIC Real Estate Investment Joint Stock Company
    • Mr. Le Dang Minh – General Director
    • Mr. Pham Van Tien – Director of Engineering Division
  • Supervision Consultant – FQM Joint Stock Company
    • Mr. Nguyen Thanh Van – General Director
    • Mr. Nguyen Thanh Phuong – Project Division Director
  • As CENTRAL
    • Mr. Tran Quang Tuan – General Director
    • Mr. Mai Chanh Thanh – Executive Director
    • Mr. Pham Huu Phuc – Project Director
    • Mr. Huynh Minh Trong – Site Manager
  • As construction partner:
    • Diaphragm wall contractor:
      • Mr. Pham Hoang Nhan – General Director of Bachy Soletanche Company (France).
    • Bored pile construction contractor:
      • Mr. Quu Pheng. Hui – General Director of Tung Feng (Taiwan).

Together with partners, customers, and the Steering Committee of the project.

Mr. Le Dang Minh, Mr. Tran Quang Tuan, and the Board of Directors of the Investor, SC, General Contractor jointly performed the ceremony to offer incense.

Thao Dien Green Towers is located in a precious location of Thao Dien area which is one of the best quality places in the city. Around the project, there are many high-end apartment ones such as Xi Riverview Palace of GS Group (Korea); River Garden of Indochina Land investor (USA); D’Edge and Vista of Investor Capital Land (Singapore), …

Project location with Saigon river view

The project with a scale of 2 basements and 25 floors is built on the land of 5,000 m2. The total construction floor area is 40,000 m2 and project completion progress 26 months. CENTRAL as General Contractor will immediately execute the work of bored piles and diaphragm wall right after the ceremony.

SIC Real Estate Investment Joint Stock Company is a reputable, stature investor with strong financial potential in Hanoi, specializing in providing high-end real estate projects. The fact that SIC investors believed and appointed CENTRAL as the general contractor for their first real estate project in Ho Chi Minh City was a great honor for CENTRAL’s team.

The Board of Directors of all parties took souvenir photos on the commencement day.

During the ceremony, CEO Tran Quang Tuan said: “In response to the belief from the Investor, CENTRAL commits Thao Dien Green Towers project with the best quality, progress, and safety. Contributing successfully to the project and creating a premise for long-term cooperation with SIC Investor in future projects ”.

CEO Tran Quang Tuan announced at the ceremony

Other pictures from the Ceremony:

View of the Commencement Ceremony of Thao Dien Green Towers project
CEO Tran Quang Tuan shook hands to thank the guests.
Project Steering Committee of Thao Dien Green Towers