Phu Lac 2 Wind Power Factory

Client

REE Corporation

Location

Phu Lac, Tuy Phong, Binh Thuan

Scope of work

BOP General Contractor
26 MW/Total cable length 2.8 km

Time

Handed over in 6/2021

Phu Lac 2 Wind Power Factory

Vestas – Denmark provides all of the Factory’s wind turbine equipment, which meets European standards and ensures quality and long-term performance. The installation of the first wind turbine tower was accomplished with the maximum support of sophisticated technology and equipment, as well as the ability of engineers and workers on-site, ensuring the technical standards.

Project overview image

error: Alert: Content selection is disabled!!