CENTRAL WON THE BID FOR UNIVERSITY OF ENGINEERING AND TECHNOLOGY (UET) – VIETNAM NATIONAL UNIVERSITY, HANOI (VNU)

The PMB for Vietnam National University Development of VNU-Hanoi has just announced the results of the contractor selection for the Construction Package of the University of Technology (Phase 1) (WB/VNUHN/CW/03). Accordingly, Central Construction Joint Stock Company is the winning contractor for this project.

The project is being constructed on an area of 887.9 hectares and utilizes credit funding from the World Bank. The total investment for Vietnam National University – Hanoi (VNU-HN) amounts to 123.18 million USD, equivalent to 2,894 trillion VND.

On the morning of December 17, 2024, at the Headquarters of the World Bank’s PMB, located in Headquarters Building – Center Zone of Vietnam National University, Hanoi, both Parties conducted a contract signing ceremony. Currently, the construction site has been prepared and is ready to commence construction at the end of December 2024.

Contract Signing Ceremony for the Construction Package of University of Engineering and Technology (UET) – Vietnam National University – Hanoi (VNU) (Phase 1) (WB/VNUHN/CW/03)

PROJECT INFORMATION:

Project Name:University of Engineering and Technology (UET) – Vietnam National University – Hanoi (VNU)
Address:Thach Hoa Commune, Thach That District, Hanoi City
Investor:PMB for Vietnam National University Development of VNU-Hanoi
Design Consultant:Design Consultant And Investment Of Constructions One Member Limited Liability Company (DCCD)
Scope of Work:Structure, Finishing, MEP, and Infrastructure Works
Land Area:41,000m2
Perspective of Vietnam National University – Hanoi Campus in Hoa Lac

Vietnam National University – Hanoi, once officially operational, will become a symbol of the most modern and smart green university urban area in Southeast Asia. The university has invested in many prominent facilities such as lecture halls, libraries, indoor and outdoor sports areas, cafeterias, dormitories, and green landscape areas.

In the field of education, Central has affirmed its position with a series of international standard school projects across the country. In the northern region, notable projects include: Singapore International School (Hai Phong), Dewey International School Ocean Park (Gia Lam, Hanoi), Chadwick International School, and Edison International School (Ecopark, Hung Yen), along with Phenikaa University (Ha Dong).

In the southern region, Central has successfully handed over projects such as Emasi Nam Long School (District 7) and Blue Sky Mega Residence School (District 9). Notably, the Emasi Plus International School – Water Point Campus in the Waterpoint Urban Area, Nam Long, Long An, has become a pioneering symbol in applying energy-saving green technology and using materials according to green building standards – LEED.

Central is proud to accompany this large-scale educational project. With a strong technical expertise foundation and a diverse accumulation of experience, Central has asserted its leading position through the application of modern technology and a professional project management process. We are committed to implementing the project with the highest determination, ensuring quality construction and timely delivery as committed.

Central not only aims to construct buildings but also aspires to make significant contributions to the development of education in Vietnam. Participating in international standard educational projects is part of our long-term strategy, with the goal of enhancing education quality and providing a modern and comfortable learning environment for future generations. Central continuously strives to contribute to building a better education for everyone. We are proud to contribute to the nation’s educational development.

TOPPING OUT CEREMONY OF THE TTC BUSINESS INCUBATOR – OFFICE BUILDING C

On the morning of November 30, 2024, at Lot D1, Tan Thuan Export Processing Zone, District 7, Ho Chi Minh City, Central Construction Joint Stock Company and the investor, Tan Thuan Co., Ltd. (TTC), solemnly organized the topping-out ceremony for the TTC Business Incubator Project – Office Building C. This event marks an important milestone as the project has been topped out 1.5 months ahead of schedule, bringing great pride to all parties involved.

Attendees at the ceremony included:

From the Investor:

  • Mr. Nguyen Tan Phong – Deputy General Director
  • Mr. Yuan Dong – Director of the Service Department
  • Mr. Hoang Bao Quoc – Deputy Director of the Service Department
  • Mr. Hoang Duc Thinh – Construction Manager

From SCQC Saigon Construction Quality Control Joint Stock Company:

  • Mr. Tran Hai Minh – Chief Supervisor

From Sino-Pacific Construction Consultancy Co.,Ltd:

  • Ms. Thai Anh Ngoc – Chief Designer

From Central:

  • Mr. Nguyen Thien Thuat – Project Director
  • Mr. Nguyen Duc Hau – MEP Project Director
  • Mr. Do Tran Duy Vinh – Project Manager
  • Mr. Do Van Phuc – MEP Project Manager
The leadership teams from all parties participated in the ceremonial raising of the golden steel beam

For this project, Central Construction JSC is serving as the General Contractor for the complete execution of the following works: structure, finishing, interiors, façade, MEP systems, infrastructure, and landscaping. Commencing in February 2024, the project has overcome numerous challenges and achieved significant milestones. Notably, the excavation work for the basement was completed one month ahead of schedule, and the final slab pour for the roof was carried out 1.5 months earlier than planned.

“The TTC Business Incubator – Office Building C” will provide office space for businesses operating in software, design, commerce, and startups. This project continues the success of the investor following the operational launch of buildings A and B.

The TTC Business Incubator Project – Office Building C during the topping out ceremony

In response to the trust placed in them by the investor and to express gratitude to the partners involved, Mr. Do Tran Duy Vinh – Project Manager on behalf of Central stated: “During the construction process, conflicts and challenges are inevitable. However, with the professionalism of a reputable general contractor and the seamless coordination among all parties, every issue has been resolved. The success of a project is a collective effort, uniting the strength of all of us here.”

Mr. Do Tran Duy Vinh – Project Manager expresses gratitude to the partners and clients whose collaboration contributed to the project’s success.

Following the topping out ceremony, the project team will continue to accelerate the finishing works: complete the mock-up floor as planned; finalize the interiors and construct the facade; and simultaneously implement the surrounding infrastructure. We are committed to completing the project on time, ensuring the highest quality, and handing it over to the investor for operations as per the established plan. This not only demonstrates Central’s capabilities and reputation but also reflects the trust and expectations that the investor has placed in us.

Some images from the ceremony:

Quang cảnh buổi Lễ cất nóc dự án Vườn Ươm Doanh Nghiệp TTC – Tòa Nhà Văn Phòng C

CENTRAL WINS THE BID FOR DESIGN AND BUILD OF 17 TECHCOMBANK BRANCH OFFICES

On November 22, 2024, Central received the notification of winning the bid for the finishing and interior design package for a series of 17 Techcombank branch offices. Earlier approvals for component packages such as Design, Pile, Basement Structure, Superstructure, Finishing, and MEP have also been granted. Officially, Central, along with the investor Techcombank, will focus all efforts on implementing the comprehensive Design and Build package for the 17 Techcombank branch offices.

The branch offices of Techcombank (Vietnam Technological and Commercial Joint Stock Bank) are located on major thoroughfares in the key provincial and city centers, including:

Thai NguyenNam DinhBinh Duong
Bac GiangNghe AnTay Ninh
Vinh PhucBinh DinhBinh Phuoc
Lang SonGia LaiVung Tau
Hai PhongBinh ThuanAn Giang
Hai Duong Ca Mau

Central’s success in winning the bid for the comprehensive Design and Build of this project suite signifies a strategic and sustainable partnership with Techcombank in establishing modern, high-standard, and environmentally friendly branch offices, providing a seamless experience for customers during transactions. As a pioneer and leader in providing comprehensive Design and Build services, Central not only assists investors in optimizing costs and controlling quality but also shortens construction time, allowing projects to be operational sooner.

Collaboration with an industry giant like Techcombank not only reinforces but also strengthens the solid trust that Central, ranked among the top 3 most reputable construction contractors in Vietnam, has built. Techcombank is the first bank in Vietnam to achieve the prestigious ‘hat-trick’ award for “Best Bank in Vietnam” from three leading global organizations: Euromoney, FinanceAsia, and Global Finance. It is also the leading private joint-stock commercial bank in Vietnam, with pre-tax profits exceeding 3 billion USD over the last three years.

Illustrations of the Techcombank Branch Office in Bac Giang City
Illustrations of the Techcombank Branch Office in Phan Thiet City

Despite the construction market facing numerous challenges in recent years, Central recorded revenues of 9.014 trillion VND in 2022 and 8.142 trillion VND in 2023, placing it among the top 3 in the industry. The corresponding net profit after tax stood at 230 billion VND and 200 billion VND, leading the industry in profit margins. Central is honored to receive the trust of Techcombank, which has chosen it for the construction of branch offices extending across all three regions of the country.

As a leading reputable contractor in the segment of modern office tower projects, Central has been creating numerous high-class offices nationwide, including the Daikin (Japan) headquarters, C.P. Group (Thailand) office, UOA (Malaysia) office, HallMark (OCB bank) office, Mett (Shinhan Bank, South Korea) office, Etown 5 & Etown 6 with record basement depths in Vietnam, the headquarters of The Gioi Di Dong, and the Cyber Security Department (A05, Ministry of Public Security) office. For each project, Central’s management consistently implements the most effective construction measures tailored to the specific location and prioritizes safety throughout the construction process, delivering projects that are not only high-quality but also reliable upon handover.

Central takes pride in providing sustainable and high-class value through its projects, affirming a solid position within the construction industry in Vietnam.

With dedication, responsibility, and professionalism in every action, Central commits to mobilizing the best resources, ensuring absolute safety during the construction process, and achieving the highest quality standards to deliver projects on schedule as promised to the investors.

CENTRAL ORGANIZATION OF THE BASEMENT CLOSING CEREMONY FOR THE SUN SYMPHONY RESIDENCE PROJECT

On the morning of October 30, 2024, Central, in collaboration with the Investor Sun Group, organized the closing ceremony for the basement of the Sun Symphony Residence Project in Da Nang. This event marks an important milestone, recognizing the efforts and achievements of Central’s PMB, the project management team, and partners in implementing a high-class project along the banks of the Han River.

Distinguished guests in attendance included:

Representatives from the Investor, Sun Group:

  • Mrs. Bui Thi Thanh Huong – Vice Chairwoman of the Board of Directors and General Director
  • Mr. Pham Duc Hung – Board Member and Chairman of the Member Council of SUNPMC
  • Mr. Nguyen Van Binh – Chairman of Sun Group in the Central Region
  • Mr. Nguyen Tuan Anh – Director of the Da Nang Board of the PMU

Representatives from the General Contractor, Central:

  • Mr. Tran Dang Khoa – Executive Director
  • Mr. Võ Quang Dat – Project Director
  • Mr. Tran Dinh Vy – MEP Project Director

Along with clients, partners, and staff from both parties.

The leadership of the involved parties congratulated the milestone of closing the basement
A view of the closing ceremony for the Sun Symphony Residence Project basement

The leadership of the involved parties congratulated the milestone of closing the basement. A view of the closing ceremony for the Sun Symphony Residence Project basement.

The Sun Symphony Residence Project belongs to the premium segment of Sun Group in Da Nang. Positioned opposite the city’s administrative center, it offers a favorable vantage point to enjoy breathtaking firework displays from the International Fireworks Festival. Central has undertaken the construction of the entire underground section of Towers B1.1 & B1.2, as well as the structural and finishing works for Tower B1.1. Notably, the project’s three basements were completed at a rapid pace within 150 days and nights. The tunnel closure was achieved ahead of schedule, ensuring safety and quality commitments to the Investor.

During the ceremony, Mr. Nguyen Tuan Anh, Director of the Da Nang Board of the PMU, stated: “Today’s achievement is not only the result of those directly involved in the construction but also the invaluable support from leadership, partners, and our families, who have encouraged and accompanied us throughout this long journey. Each concrete block poured and each roar of the machinery serves as a testament to the perseverance and determination of everyone involved.”

Mr. Nguyen Tuan Anh – Director of the Da Nang Board of the PMU speaks.

Representing Central’s leadership, Mr. Tran Dang Khoa, Executive Director, remarked: “We are honored to be entrusted with this project by the Sun Group. The Central’s PMB, with a spirit of relentless work, has overcome various challenges to stay on schedule. Moreover, with our experience in organized and methodical project management, we are committed to delivering a unique and exceptional product to the Investor.”

Mr. Tran Dang Khoa – Executive Director of Central speaks

As we move forward, we wish the project team and partners continued success, maintaining collaborative efforts to ensure the project is completed safely and on schedule.

CENTRAL WINS THE CONTRACT FOR THE STRUCTURAL AND FINISHING WORK OF THE SUN SYMPHONY RESIDENCE PROJECT IN DA NANG

Central Construction Joint Stock Company has received a notification letter of contract award from the Investor, Sun Group, for the Sun Symphony Residence project, Tower B1.1.

Currently, the project is in the process of executing the underground construction. With a solid management experience, a professional organization, and a systematic technical investment, combined with a commitment to quality and safety throughout the process, these factors have instilled confidence in the Investor to choose CENTRAL to continue with the structural and finishing works of the project.

The Sun Symphony Residence project offers a view towards the Administrative Center of Da Nang

Situated on the last prime land along the Han River, facing Tran Hung Dao Street, Son Tra District, Da Nang City, the Sun Symphony Residence project connects the three busiest districts of the city, providing a breathtaking view towards the Administrative Center and the sea entrance. With a scale of three twin towers ranging from 24 to 30 floors, the project will deliver approximately 1,300 high-end apartments to the real estate market upon completion.

Currently, Central’s Project Management Board is accelerating construction progress, aiming to complete the capping of the basement by the end of this month, ahead of the schedule stipulated in the contract.

With robust resources and a strong team, possessing the expertise of a leading contractor in Vietnam, along with proven capabilities and reputation through a series of prestigious previous projects, Central is confident in successfully executing the Sun Symphony Residence project by implementing effective construction solutions that meet safety and quality requirements, ultimately delivering a product that matches the scale and value of this endeavor.

CENTRAL AS A DESIGN & BUILD CONTRACTOR FOR PHAN THIET – DAU GIAY REST STATION

Central Construction Joint Stock Company received a winning bid letter for the construction of Phan Thiet – Dau Giay Rest Station from FUTA Group.

Through the process of bidding including design ideas as well as optimal Design and Build proposals, the Central team has excellently surpassed many competitors in the market to be chosen and trusted by the Investor.

This is the first time Central has cooperated with FUTA Group – the No. 1 brand of Vietnam’s transportation industry. Central – Vietnam’s leading general contractor with a team of experienced personnel and outstanding construction capacity, committed to handing over Phan Thiet – Dau Giay Rest Station on schedule and being ready for operation in the Lunar New Year 2025.

PROJECT INFORMATION

Project name:FUTA Rest Station
Phan Thiet – Dau Giay Rest Station
Location:Km47 + 500 Phan Thiet – Dau Giay component project, the Eastern North-South expressway.
Contract Form:Design & Build Contractor
Land area:12 hectares
The perspective of the Phan Thiet – Dau Giay Rest Station is inspired by the image of the Chim Lac’s wing “Lifting off the ground” flying to the sky, not only valuing the traditional beauty, honoring national cultural values but also showing a broad vision, an aspiration to rise high and a sustainable development of FUTA Group

Phan Thiet – Dau Giay expressway with a total length of nearly 100 km and currently there are no rest stations. The upcoming Phan Thiet – Dau Giay Rest Station will mark an important milestone in the long-distance transportation system of the FUTA Group. With a total investment of 5 times more than the previous rest stations, this new one promises to bring the ultimate travel and transportation experience to passengers.

Besides, the Rest Station also exudes luxury, modernity with a spacious and comfortable space, “not only a rest station but also a place to relax, shop, eat, experience & explore”. This is also the message that the Investor wants to send to each passenger when arriving at the rest station.

The project site at Km47+500 Phan Thiet – Dau Giay component project, the Eastern North-South expressway

FUTA Group was established in 2001, operating with the motto “Quality is an honor”. After more than 20 years of establishment and development, FUTA Group has been honored with the TOP 10 National Strong Brands. In the field of transportation, the group expands high-quality transportation activities to serve the travel needs of people from North to South. Up to now, FUTA Bus Lines has developed more than 350 ticket offices and transfer stations, more than 4,500 buses of all kinds, serving more than 40 million passengers per year.

On its development journey, Central has always made continuous efforts to become the leading General Contractor in Vietnam. To achieve this position, it is impossible not to mention the trust that the Investors and Clients have given to Central. This credibility is reflected in the specific and highly complex projects that Central has undertaken. It is the belief from the Investor that has created a solid foundation for Central to succeed./.