THREE CONSTRUCTION PROJECTS OF VINGROUP PROCEEDED BY CENTRAL

CENTRAL is having 3 new VINGROUP’s construction projects.

The First Project: Vincity Grand Park

CENTRAL is a general contractor for 8 Towers. The contractor uses the new construction method – FULL TOP DOWN – building a basement and the body at the same time. CENTRAL has recently invested Gang form, an equipment imported from Korea, to pour a whole concrete into a 100% concrete walls instead of the traditional construction.

Perspective of Vincity Grand Park Project (Dictrict 9, HCMC)

Real construction photo at Vincity Grand Park (Dictrict 9, HCMC)

The second Project: Vinhomes Smart City – Tay Mo Dai Mo

Here are the 3 CENTRAL construction towers located in Thang Long Avenue, west of Ha Noi with 280ha scale.

Perspective of Vinhomes Smart City 

Real construction photo at Vinhomes Smart City

The third Project: Phu Quoc Grand World

At the middle of March 2019, CENTRAL commences the project of Phu Quoc Grand World located at Bai Dai – one of the most beautiful Paradise beaches on earth , Phu Quoc island , has a variety of  fine hotels such as Condotel, Sho, Minihotel,…

This in one of the largest Vingroup’s works including the huge catergories built near the Phu Quoc Casino complex.

Perspective of Grand World Phu Quoc

Besides, Vinmec Times City project by CENTRAL as the main contractor is promptly in the finish stage of MEP to prepare for the handover in June, 2019.

Real construction photo at the site Vinmec Times City

At the same time, CENTRAL has also topped these projects: Opal Tower, Etown 5, Five Star Tower to get ready for the 3 Vingroup’s construction projects as well as the others.

CENTRAL WINNING THE CONSTRUCTION BASEMENT THE SHANGRI-LA HOA LAM PROJECT

On February 22, 2019, CENTRAL winning to be the main contractor for the construction of the basement structure for the “Shangri-La Hoa Lam Project” located in the High-Tech Healthcare Zone.

The project is built on a land area of ​​2 hectares of a 33-hectare Shangri-La complex, including: Aeon Mall, International Hospital,…The scale of the project includes 2 hectares of basement, 4 Tower blocks, including 28 floating floors with a total floor area of ​​220,000 m2.

Hoa Lam Investor is a multidisciplinary business Group in many fields such as Real Estate, Health, Finance and Trade in Services. Specifically, Hoa Lam is the owner of the building Lim Tower 1 Ton Duc Thang Street, Lim Tower 2 Nguyen Dinh Chieu Street, Lim Tower 3 Vo Van Tan Street; Hongkong Land Investor joint venture project with luxury apartments in District 29B Nguyen Dinh Chieu Street; Hoa Lam International Hospital, … and many other projects in HCMC.

Perspective of Shangri-La Hoa Lam Project

For Investor confidence is the main contractor selected, Engineers team worked hard to find solutions spurt of construction differences, overcome the Contractor other leading Vietnam. Thereby, helping investors shorten the construction schedule earlier than 2 months, saving millions of dollars and Investors evaluate construction plans very innovative & useful.

Now, Site Management Board is urgently implementing construction works as required by the Investor.


Real construction photo at Hoa Lam

Information about Hoa Lam Investor:

http://cafebiz.vn/tu-ba-chu-thuong-hieu-xe-may-hoa-lam-kymco-den-dai-gia-tai-chinh-bat-dong-san-y-te-lot-top-50-phu-nu-anh-huong-nhat-viet-nam-20190305154511677.chn

LinhNDT

THE TOPPING OUT CEREMONY OF OPAL TOWER

On the morning of March 29, 2019, SSG Group and VietNam Land (Hong Kong) cooperated with CENTRAL to successfully organize the Topping Out Ceremony of “Opal Tower, Saigon Pearl.”

Perspective of Opal Tower

The ceremony was honored to welcome the Investor – Mr. Lo Kwok Luen (CEO), Mr. Dang Chinh Trung (BOM), Mr. Hoang Ha (Deputy General Director), Mr. Tran Duc Tam (Deputy Managing Director SSG Group), main contractor representative – Mr Mai Chanh Thanh (Executive Director), Mr. Pham Huu Phuc (Project Director), Mr Ngo Vu Dinh Phuc (Site Manager)  in common with construction teams, subcontractors and official suppliers.

A photo of Mr Lo Kwok Luen, Mr Dang Chinh Trung, Mr Hoang Ha, Mr Tran Duc Tam, Mr Mai Chanh Thanh with personnel of SSG Group.

BOD of SSG Group and Central is make topping out Ceremony.

Opal Tower scales 42 floors, was constructed by CENTRAL to complete the body within 10 months, exceeding the required schedule of 1 month. The project is built between the population of Saigon Pearl residential community, executed an average of 5 days / floor with the floor support technology highly appreciated by the investor about safety and progress. From the time of commencement (in May, 2018) to today, the construction site has achieved 1.7 million safe working hours.

A photo of Mr Lo Kwok Luen and Mr Mai Chanh Thanh with personnel of Opal Tower & SSG Group.

Mr. Ngo Vu Dinh Phuc shared: “With the strict requirements on quality safety of the Investor, the project topped out over 30 days ahead of schedule. This is a successful result for the executive board’s members. On this occasion, all employees would like to thank the board of management for facilitating the work of the executive board’s members, thank the managers at the company for accompanying the Executive Board from the beginning of the project. “

Mr Lo Kwok Luen commended the Opal Tower Site Management Board for achieving 1.7 million safe working hours.

The event of topping out is the second milestone of the project. The executive board is determined to concentrate highly on the completed construction and other works to bring the project to a quality and safety destination in December, 2019.
See more at the pictures at the Ceremony:

Mr Mai Chanh Thanh is make the releasing balloons ceremony

Colleagues of Opal Tower Project

CENTRAL IS IN ANIMATED WORKING AIR AFTER TET HOLIDAY OF THE PIG

With the rhythm of the whole country entering the first working days of the Year of the Pig, from Feb11th2019, all CENTRAL employees have embarked on the work in the animated air and bursting with happiness all around construction sites and offices.

Hope Residences construction site after Tet holiday of the Pig

Present at Opal Tower, Emasi Nam Long, Akuruhi Tower in Ho Chi Minh City, we feel the urgently working atmosphere of brothers and sisters of Project Executive Committee and hundreds of workers who are directly working on the construction siteS. Everyone is eager to work with high determination, accelerating right from the beginning of the year. Taking advantage of the favorable weather in the early spring days, Executive Committee has mobilized to the utmost its forces, equipments, and construction machines to ensure the planned progress.

The image of workers is at Opal, Emasi and Akuruhi Tower

For the Northern region, although under the intense sunshine of the day, everywhere on the site, brothers and sisters of Project Executive Committee and the workers ran with time to accelerate construction progress with determination to complete the targets and plans. With the spirit of fighting fire like the present, surely the Executive Committee will complete the construction, assign the investor to put the project into use.

Working atmosphere at Hope Residences and Thach Ban Lakeside

The Board of Directors expects that with a full of enthusiansm start and the unanimous commitment of all brothers and sisters across the system, 2019 will be a year to leave many special marks with CENTRAL.

See more photos from the first days of the year at CENTRAL:

CENTRAL WINS SYRENA 5 STAR HOTEL AND APARTMENT COMPLEX IN THE WEST LAKE, HANOI AND IMPLEMENTS THE CONSTRUCTION OF ANA MANDARA HOTEL IN CAMERA

Together with the joyful atmosphere of new year, CENTRAL opened the new year with the joy of success by winning the project ” SYRENA HOTEL AND APARTMENT COMPLEX – HANOI” by BIM Group – A reputational group in the field of Real Estate as an Investor (Investor).


Perspective of SYRENA Hotel and Apartment Complex

Accordingly, the contract for construction of bored piles and wall construction, the completed structure between CENTRAL and BIM Group was successfully signed on February 1, 2019 on the last working day of the lunar year. The project includes 4 basements and 13 floating floors. SYRENA is designed by BNB Vietnam with a modern and luxurious style including Hotel, high-class serviced apartment, swimming pool, gym and utility restaurant.

In addition to the optimal design, SYRENA also possesses extremely favorable location right at West Lake, where it has modern transport infrastructure, invested and developed synchronously, convenient connection to the commercial and financial centers and many other areas in the Capital.

Reportedly, BIM Group also owns famous brands such as Intercontinental Phu Quoc Resort, Green Bay Village Ha Long, Phu Quoc Marina Water Park, etc. and CENTRAL with prestige and practical experience through the project of resort projects and villas all over the country, it is expected that this project will be the first milestone to mark the good cooperation between CENTRAL and BIM Group. The project applies Full TOPDOWN construction method with construction period of 10 months.

The second project is Resort ANA MANDARA Hotel in Cam Ranh whose the Investor is Sovico Khanh Hoa Group (also the owner of Vietjet Air). Project scale is 30 hectares. CENTRAL undertakes the construction of two high-rise hotel buildings in this project.


ANA MANDARA Cam Ranh perspective

ANA MANDARA is one of the most luxurious resorts in Cam Ranh area. At present, CENTRAL has completed the erection of tower cranes and necessary preparatory works to be able to immediately start the main works on the first days of the Lunar New Year.


Real construction photo at ANA MANDARA on the last days of the lunar year

In addition, after the successful cooperation of Alma Resort project in Cam Ranh, on the last 28th day of the lunar year (February 2, 2019), Alma decided to award another contract CENTRAL for INFRASTRUCTURE package in the project with the value of over 4 million USD.

CENTRAL HAS SUCCESSFULLY TOPPED OUT THE FIVE STAR TOWER OFFICE BUILDING PROJECT 30 DAYS EARLIER

On the morning of January 29, 2018, CENTRAL cooperated with the Investor – Five Star International Group to successfully organize the Topping Out Ceremony of Five Star Tower Office Building (FST) at 28 Bis, Mac Dinh Chi, District 1, HCMC.



A photo of the Board of Directors and personnel of Five Star Tower project

The ceremony was honored to welcome the distinguished guests, the Investor – Five Star International Group including Mr. Tran Van Muoi (Chairman of the Board), Mr. Dinh Quang Sang (Vice Chairman of the Board); On the side of CENTRAL (Contractor), there was the presence of Mr. Tran Quang Tuan (General Director), Mr. Mai Chanh Thanh (CEO).



CEO Tran Quang Tuan and Mr. Tran Van Muoi – Chairman of Five Star International Group’s Board of Directors

CENTRAL is the main contractor for constructing the structure and completing the project. The project is built on an area of 1,140 m2; in which the total construction floor area is 13,074 m2; total floor area of tower of 9.360 m2; total floor area for parking basement of 3,714 m2. FST is designed by DCM Studios Hong Kong, with modern office building architecture including 16 aboveground floors and 3 underground floors. Accordingly, the whole idea of the project is to create a dynamic civilized work space, with attractive landscape, with identity, meeting users’ desires, creating highlight in planning, close to nature, environment-friendly.


Five Star Tower Office Building

FST has a prime geographical position with extremely convenient transportation system in front of the road of Mac Dinh Chi and Tran Cao Van street, from there connecting to Le Duan and Pham Ngoc Thach streets into the city center, City post office and Notre Dame Cathedral associated with the most modern trade centers and offices in the country.

Compared to the plan, the CENTRAL managers of the Five Star Tower project have excellently topped out the project 30 days ahead of schedule.


Mr. Tran Van Muoi – Chairman of Five Star presented the reward to the site managers of CENTRAL (Contractor)

Previously, the investor had trusted and awarded the contract to CENTRAL to implement MEP package. In the near future, CENTRAL will focus on completing construction works and MEP to soon hand over the works into operation by the end of the second quarter of 2019.