Projects

Year

Regions

Quang Tri Airport

The Quang Tri Airport project (a level 4C facility, oriented capacity to serve 5 million passengers/year), invested by T&T Group and Cienco 4 consortium, has been started in July 2024 and is expected to complete phase 1 in July 2026….

View Detail

University of Engineering and Technology – Vietnam National University – Hanoi

University of Technology (Phase 1) (WB/VNUHN/CW/03) is under the Vietnam National University Development of VNU-Hanoi. The project is being constructed on an area of 887.9 hectares and utilizes credit funding from the World Bank. The total investment for Vietnam National…

View Detail

Sun Serenia Hospital Phu Quoc

Inspired by the Imperial Medical Institute and the architecture of Southern garden houses, the hospital reflects traditional beauty within a modern medical space. Covering an area of over 10,000 square meters with a scale of six floors, the project is…

View Detail

Sumou Towers (Saudi Arabia)

The project consists of two towers of 63 and 71 stories, standing 310 meters tall, with a total floor area of 415,500 square meters. This project not only demonstrates Central’s expanded influence but also solidifies the brand’s presence on the…

View Detail

Taipei Twin Towers (Taiwan)

This project features five underground floors, two towers of 55 and 73 stories, standing at 369 meters, and a total construction area of 590,000 square meters, designed by the renowned American architectural firm SOM (Skidmore, Owings & Merrill). Located at…

View Detail